About Us
Contact Points
Getting a Plot
Group Housing Scheme
Building Regulation
Community Facilities
Possession of Plot
Single Service Window
Citizen's Charter
Home

Mail to HUDA


For taking possession an application on plain paper is required to be  submitted  by the allottee duly signed by him/her. The allottee must ensure that all the outstanding dues have been paid. After verification of signatures of the allottee from the record, the possession of the plot is delivered to the allottee. 
 

Zoning Plan Regulations

Building Plans Sanctioning

Precautions while Designing a House

DPC Certificate

Occupation / Completion Certificate

Renewal of part Completion

Sewerage & Water Supply Connections

Electricity Connection
 

ZONING PLAN REGULATIONS

For the construction of buildings on the allotted  parcels of the land, HUDA has framed  detailed Building  Byelaws and Zoning plans. Zoning regulation gives specific information regarding the extent of  land exploitation allowed on a particular  piece of land depending on its land use (through F.A.R, ground coverage etc.) and also gives  broad guidelines on the maximum height of building permitted, location and design of gates and boundary wall, exterior finishes and  elevations etc. This ensures  that minimum standards of  aesthetics and urban design are  maintained. Copy of Zoning  Plans for each sector  or institution can be obtained from the office of District Town Planner, concerned on payment of requisite fee. 

Top

HOW  YOU CAN GET BUILDING PLANS SANCTIONED?

  The following documents are required to be submitted  for sanctioning of building plan.:

  • Four complete sets of  drawings duly signed by the enlisted Architect and the owner. Two sets should be  mounted on cloth.
  • Form BR-I & II duly signed  by  the  owner  and   the Architect.
  • Copy of possession certificate.
  • Scrutiny fee @ Rs. 10/- per sq.mt. (covered area) in shape of  bank  draft  in  favour  of  concerned Estate Officer, HUDA.
  • Malba Fee/Security:

 A. Residential Plots:

      (i) Upto 6 Marla                                                             Rs. 5,000/-

     (ii) Above 6 Marla and upto 1 Kanal                                Rs. 10,000/-

     (iii) Above 1 Kanal                                                          Rs. 20,000/-

 

B. Industrial, Institutional and Group Housing Plots:

    (i) Upto 1/4th acre                                                             Rs. 25,000/-

   (ii) Above ¼ acre and upto 1 acre                                      Rs. 50,000/-

   (iii) More than 1 acre                                                         Rs. 1,00,000/-

 

C. Commercial:

    (i) Booths                                                                         Rs. 10,000/-

    (ii) SCOs/SCFs/DSS/ etc.                                                Rs. 50,000/-

         (Governed by Architectural Control)

    (iii) Others                                                                        Rs. 1,00,000/-

 

Note: For more details please see the policy section UB-II.

Top
PRECAUTIONS WHILE DESIGNING/ PLANNING A HOUSE

 The following precautions shall be observed while designing a house.

  • Organization of various spaces as per orientation.
  • Placement of habitable rooms/living room in such a way so that every compartment gets adequate light and ventilation.
  • All the public health/electrical pipes should be properly concealed in walls to render the building good aesthetic appearance.
  • Organisation of space should be done in such a way that there is a bare minimum space wastage in circulation.
  • Sizes of various habitable rooms should be as per norms.
  • The design of the house should be such that there should be a fealing of an intimacy to the dweller.
  • The design of house should be such that it should cater all the requirements of the dweller.
  • The treatment of outer façade should be done in such a way that there should be no seepage.
  • While designing a house, the placement of coloumns/load bearing walls should be in such a way that it should require bare minimum steel, thus resulting into a great economy.

  • While designing emphasize should be given to the maximum comforts in terms of Balconies and open terraces for using in summer and winter as the case may be.

  • It is always better to provide terraces on the front to give a wider street picture.
Top
HOW YOU CAN GET DPC CERTIFICATE?
An application on plain paper alongwtih following documents is required to be submitted by the allottee:-
  • Certificate from the Architect.
  • Copy of possession certificate.
  • Copy of sanctioned building plan.
  • Copy of letter of allotment.
It may please be noted that it is mandatory to get this certificate when building reaches DPC level, otherwise heavy penalty is charged as per policy.
Top
HOW  YOU CAN GET OCCUPATION/COMPLETION CERTIFICATE?
  The following documents are required for obtaining a completion certificate  
  • Copy of DPC certificate
  • Report of  Architect in form BR IV and V.
  • Copy of  Sanctioned plan.
  •  An affidavit regarding non commercial use of  the plot in case of plots other than commercial.
  • Copy of  possession certificate
  • Four photograph of building( front/ back/ toilet and kitchen)
Top
WHAT IS RENEWAL OF PART COMPLETION ?

  Some plot holders apply for and obtain part completion certificate after having constructed 25% of the permissible covered area/one living unit. The validity of the part certificate is only for six months. After expiry of six months it should be got revalidated otherwise part  completion certificate will deemed to have expired. Plot holders who have not obtained revalidated part certificate, are required to do so without delay.

  It may please be noted that w.e.f. 1.1.98, the minimum construction of a Residential  plot has been fixed 25% of the  covered area permissible on Ground Floor which includes one habitable room, a kitchen and a toilet.

Top
HOW  YOU CAN GET SEWERAGE & WATER SUPPLY  CONNECTIONS? 

1)    The application for a water connection is to be made after the building plan is approved, on prescribed format. The documents as mentioned in the  formal are to be annexed duly attested. The form is to be signed by the owner and the licensed plumber, who shall do the plumbing work.

2)     In case the road has to be cut to provide a connection to the site then the road cut charges have to be paid along with the application. Road cut charges are being charged @ Rs. 800/- per sqm. for internal C-road and @ Rs. 860/- per sqm.  for B-road. (These are average rates  and in some particular conditions the rates shall be increased on actual basis).

In addition to the above security and connection fee at the following rates is to be paid.

Security for water and sewer connection

  1. Upto 4 Marla  Rs. 200/-
  2. Beyond 4 Marla upto 6 Marla  Rs.300/-
  3. More than 6 Marla  but less than 10 Marla Rs. 400/-
  4. 10 Marla Rs.500/-
  5. Beyond 10 Marla Rs.1000/-
  6. For Commercial Rs 2000/-
  7. For Industrial and Institution

          a) Upto 1Acre Rs. 2000/-
          b) Above 1 Acre but upto 2.5 Acre Rs. 3000/-
          c) Above 2.5 Acre Rs. 5000/-

Water connection fee

  1. Rs. 500/- upto 10 Marla
  2. Rs. 1000/- above 10 Marla
  3. Rs. 1000/- for Institutional , Industrial and Commercial.

Sewer connection fee

  1. Rs. 300/- upto 10 Marla
  2. Rs. 500/- above 10 Marla
  3. Rs. 500/- for Institutional , Industrial and Commercial.

   Normally for a residential plots a 12mm   connection is sufficient 
   Normally water connection is sanctioned within 15 working days.

Top
HOW YOU CAN  GET ELECTRICITY CONNECTION 

  Once the completion certificate is issued by the Estate officer, no time may be wasted in applying for for permanent Electric connection, along with a test report on a prescribed form (available from Haryana Vidyut Parisar Nigam) duly signed by the registered Electrical contractor and along with an attested copy of occupation certificate issued by the Estate officer. Normally, the electric metal are not available with Nigam and the same are to be purchased by the house owner and handed over for testing to UHVNL/DHVNL. The testing process may take time and it should, therefore, be applied for as early as possible. 

Top

Note:  There is an other option for construction of buildings in the form of self certification procedure. Which is applicable on residential plots( except group housing ) , industrial and commercial building governed by architectural control. The policy in detail can be seen on the home page under the head  "public notice - self certification policy of building plans " .


 [ About Us | Conatct Points | Getting a Plot | Group Housing Scheme | Regulations and Procedures |
 Community Facilities | Possession of Plot | Single Window Service | Citizen's Charter